Skip to main content

Energy efficiency experts estimate that with appropriate energy efficiency measures, Serbia could save 30-40% of energy, which is normally imported in a similar amount. Currently, the level of energy efficiency in the country is quite low, because the consumption of electricity per unit of residential space in Serbia is about 200 kWh, while in the EU it is on average about 140 kWh. Nevertheless, there is a growing trend of investments, especially in the field of renewable energy sources.

Most of the electricity needs in Serbia are met by domestic production. About 70% of electricity in Serbia is produced from coal, and the remaining 30% comes from hydropower plants.

The National Electric Power Company EPS (Electric Power Company of Serbia) controls all major production capacities and supplies the majority of users, which makes it the dominant player on the Serbian electricity market. In addition to managing 99% of total electricity production, EPS provides 97.25% of Serbia’s electricity needs.

With lignite deposits totaling 4.5 billion tons, Serbia has significant coal reserves. The two primary coal basins, Kolubarski and Kostolački, contain large reserves. EPS subsidiaries are responsible for the ownership and management of coal mines in Serbia. Since the mid-1950s, the country has produced small amounts of gas and oil, but remains heavily dependent on imports, primarily from Russia.

Serbia is also characterized by the largest installed hydropower capacity in the area. More than two-thirds of this capacity is concentrated near the border with Romania, where the Djerdap 1 and 2 hydroelectric power plants (capacity of 2,116 MW and 540 MW) are located. These hydropower plants are equally shared with Romania.

The potential of renewable energy sources

A feasibility study on the potential for wind production in Serbia showed that wind farms with an annual production of 2.3 TWh can install a total of 1,316 MW (wind speed above 5 m/s). There is currently less than 500 MW of installed and utilized capacity.

The windy Košava region, which includes South Banat and Eastern Serbia, the eastern regions of Kopaonik, Zlatibor and Pešter, as well as mountain passes at altitudes above 800 meters, as well as the basins of the Danube, Sava and Morava rivers, have the greatest potential for wind energy in Serbia.

In a broader framework, according to ENTSOE’s ten-year network development plan, it is predicted that, without major network development, the current transmission capacity in the Southeastern Serbia region will not be sufficient until 2030 to enable safe and reliable energy transmission to and from the region.

Returning to the local level, there is no doubt that investments are needed, and there are numerous initiatives on this front. However, in order to connect the new power plants to industrial and commercial consumers, as well as to the existing ones, more development of the transmission and distribution network will be necessary.

If you are interested in more information about the regulatory framework itself, opportunities for subsidies, or concrete opportunities for investments in the field of energy (or renewable sources specifically), you can contact us at office@ikonicstikovic.rs.